Industrial Piping and Equipment Estimation Manual delivers an invaluable resource for day-to-day operations. Packed full of worksheets covering combined and simple cycle power plants, refineries, compressor stations, ethanol, hydrogen and biomass plants, this reference helps the construction engineer and estimator learn how to create bids where scope and quantity differences can be identified and project impacts estimated. Beginning with an introduction devoted to labor, productivity measurement, estimating methods, and factors affecting construction labor productivity and impacts of overtime, the author then explores equipment through hands-on estimation tables, including sample estimates and statistical applications.
The book rounds out with a glossary, abbreviations list, formulas, and metric/standard conversions, and is an ideal reference for estimators, engineers and managers with the level of detail and equipment breakdown necessary for today’s industrial operations.
1. Introduction - p. xv 2. Equipment Section General Notes - p. xxxiii 3. 1. Process Piping - p. 1 4. 2. Combined Cycle Power Plant Equipment - p. 49 5. 2.1. Scope of Field Work Required for Each F Class CTG - p. 49 6. 2.2. F Class CTG Estimating Data - p. 51 7. 2.3. F Class CTG Installation Estimate - p. 53 8. 2.4. F Class CTG-Equipment Installation Man Hours - p. 56 9. 2.5. General Scope of Field Work Required for Each Reheat Double Flow STG Sheet 1 - p. 57 10. 2.6. Double Flow STG Estimating Data - p. 59 11. 2.7. Double Flow STG Installation Estimate - p. 62 12. 2.8. Reheat Double Flow STG-Installation Man Hours - p. 67 13. 2.9. General Scope of Field Work Required for Each Three-Wide HRSG - p. 68 14. 2.10. HRSG-Triple Pressure, Three-Wide Estimate Data - p. 69 15. 2.11. HRSG-Triple Pressure, Three-Wide Estimate - p. 73 16. 2.12. HRSG Triple Pressure; Three-Wide-Installation Man Hours - p. 79 17. 2.13. General Scope of Field Work Required for Each Double Wide HRSG - p. 80 18. 2.14. HRSG Triple Pressure Double Wide Estimate Data - p. 81 19. 2.15. HRSG-Triple Pressure, Double Wide Estimate - p. 85 20. 2.16. HRSG Triple Pressure; Double Wide-Installation Man Hours - p. 90 21. 2.17. General Scope of Field Work Required for Each Single Wide HRSG - p. 91 22. 2.18. HRSG Double Pressure Single Wide Estimate Data - p. 92 23. 2.19. HRSG Double Pressure Single Wide Estimate - p. 95 24. 2.20. HRSG Double Pressure; Single Wide-Installation Man Hours - p. 100 25. 2.21. General Scope of Field Work Required for Each Single Pressure MAWP HRSG - p. 101 26. 2.22. HRSG Single Pressure Double Wide Estimate Data - p. 102 27. 2.23. HRSG-Single Pressure, Double Wide Estimate - p. 104 28. 2.24. HRSG Single Pressure; Double Wide-Installation Man Hours - p. 109 29. 2.25. General Scope of Field Work Required for Each Air Cooled Condenser - p. 110 30. 2.26. Air Cooled Condenser Estimate Data - p. 111 31. 2.27. Air Cooled Condenser Installation Estimate - p. 116 32. 2.28. Air Cooled Condenser-Installation Man Hours - p. 123 33. 2.29. General Scope of Field Work Required for Each Surface Condenser - p. 124 34. 2.30. Surface Condenser Estimate Data - p. 124 35. 2.31. Surface Condenser Installation Estimate - p. 126 36. 2.32. Surface Condenser-Equipment Installation Man Hours - p. 129 37. 2.33. Structural Steel Man Hour Table - p. 129 38. 3. Simple Cycle Power Plant Equipment - p. 131 39. 4. Refinery and Hydrogen Plant Equipment - p. 149 40. 5. Compressor Station Equipment - p. 189 41. 6. Biomass Plant Equipment - p. 195 42. 7. Ethanol Plant Equipment - p. 237 43. 8. Sample Estimates and Statistical Applications to Construction - p. 271 44. Appendix A: Formulas—Areas and Volumes - p. 303 45. Appendix B: Metric/Standard Conversions - p. 305 46. Glossary of Key Terms - p. 307 47. Index - p. 311
Industrial Piping and Equipment Estimation Manual delivers an invaluable resource for day-to-day operations. Packed full of worksheets covering combined and simple cycle power plants, refineries, compressor stations, ethanol, hydrogen and biomass plants, this reference helps the construction engineer and estimator learn how to create bids where scope and quantity differences can be identified and project impacts estimated. Beginning with an introduction devoted to labor, productivity measurement, estimating methods, and factors affecting construction labor productivity and impacts of overtime, the author then explores equipment through hands-on estimation tables, including sample estimates and statistical applications.
The book rounds out with a glossary, abbreviations list, formulas, and metric/standard conversions, and is an ideal reference for estimators, engineers and managers with the level of detail and equipment breakdown necessary for today’s industrial operations.
1. Introduction - p. xv 2. Equipment Section General Notes - p. xxxiii 3. 1. Process Piping - p. 1 4. 2. Combined Cycle Power Plant Equipment - p. 49 5. 2.1. Scope of Field Work Required for Each F Class CTG - p. 49 6. 2.2. F Class CTG Estimating Data - p. 51 7. 2.3. F Class CTG Installation Estimate - p. 53 8. 2.4. F Class CTG-Equipment Installation Man Hours - p. 56 9. 2.5. General Scope of Field Work Required for Each Reheat Double Flow STG Sheet 1 - p. 57 10. 2.6. Double Flow STG Estimating Data - p. 59 11. 2.7. Double Flow STG Installation Estimate - p. 62 12. 2.8. Reheat Double Flow STG-Installation Man Hours - p. 67 13. 2.9. General Scope of Field Work Required for Each Three-Wide HRSG - p. 68 14. 2.10. HRSG-Triple Pressure, Three-Wide Estimate Data - p. 69 15. 2.11. HRSG-Triple Pressure, Three-Wide Estimate - p. 73 16. 2.12. HRSG Triple Pressure; Three-Wide-Installation Man Hours - p. 79 17. 2.13. General Scope of Field Work Required for Each Double Wide HRSG - p. 80 18. 2.14. HRSG Triple Pressure Double Wide Estimate Data - p. 81 19. 2.15. HRSG-Triple Pressure, Double Wide Estimate - p. 85 20. 2.16. HRSG Triple Pressure; Double Wide-Installation Man Hours - p. 90 21. 2.17. General Scope of Field Work Required for Each Single Wide HRSG - p. 91 22. 2.18. HRSG Double Pressure Single Wide Estimate Data - p. 92 23. 2.19. HRSG Double Pressure Single Wide Estimate - p. 95 24. 2.20. HRSG Double Pressure; Single Wide-Installation Man Hours - p. 100 25. 2.21. General Scope of Field Work Required for Each Single Pressure MAWP HRSG - p. 101 26. 2.22. HRSG Single Pressure Double Wide Estimate Data - p. 102 27. 2.23. HRSG-Single Pressure, Double Wide Estimate - p. 104 28. 2.24. HRSG Single Pressure; Double Wide-Installation Man Hours - p. 109 29. 2.25. General Scope of Field Work Required for Each Air Cooled Condenser - p. 110 30. 2.26. Air Cooled Condenser Estimate Data - p. 111 31. 2.27. Air Cooled Condenser Installation Estimate - p. 116 32. 2.28. Air Cooled Condenser-Installation Man Hours - p. 123 33. 2.29. General Scope of Field Work Required for Each Surface Condenser - p. 124 34. 2.30. Surface Condenser Estimate Data - p. 124 35. 2.31. Surface Condenser Installation Estimate - p. 126 36. 2.32. Surface Condenser-Equipment Installation Man Hours - p. 129 37. 2.33. Structural Steel Man Hour Table - p. 129 38. 3. Simple Cycle Power Plant Equipment - p. 131 39. 4. Refinery and Hydrogen Plant Equipment - p. 149 40. 5. Compressor Station Equipment - p. 189 41. 6. Biomass Plant Equipment - p. 195 42. 7. Ethanol Plant Equipment - p. 237 43. 8. Sample Estimates and Statistical Applications to Construction - p. 271 44. Appendix A: Formulas—Areas and Volumes - p. 303 45. Appendix B: Metric/Standard Conversions - p. 305 46. Glossary of Key Terms - p. 307 47. Index - p. 311